The Torrens Road to River Torrens Project delivered a 4km non-stop roadway (incorporating 3 km lowered motorway), between Ashwin Parade, Torrensville, and Pym Street, Croydon Park, providing significant travel time saving to commuters and freight.

Works undertaken.

  • Multiple Directional Drilling 8 x 110mm Communications under roads.
  • Multiple Directional Drilling 6 x 110mm Communications under roads.
  • Multiple Directional Drilling 4 x 110mm SAPN Power services under roads.
  • Various small diameter Directional Drilling for communications.
  • Pit and Pipe works
  • Service Locating