Works undertaken.

Horizontal Directional Drilling underneath The Queen Elizabeth Hospital was a complex major infrastructure project in a high risk environment.

  • Drill 14 m below hospital building.
  • 9 x 110 mm conduit bank of power.
  • 3 x 110 mm communications
  • 1 x 80mm fire main
  • 140mm water main within confines service space.