Works undertaken.
Horizontal Directional Drilling underneath The Queen Elizabeth Hospital was a complex major infrastructure project in a high risk environment.
- Drill 14 m below hospital building.
- 9 x 110 mm conduit bank of power.
- 3 x 110 mm communications
- 1 x 80mm fire main
- 140mm water main within confines service space.